×

MnDOT to Host Public Meeting for Highway 78 Corridor Study on Feb. 3

By Trish Johnson Jan 24, 2025 | 6:36 AM

The Minnesota Department of Transportation (MnDOT) invites community members to learn about the Highway 78 corridor study and provide feedback during a public meeting on Monday, February 3rd, from 5 to 7 p.m. at the Otter Tail County Sheriff’s Operation Center, located at 469 Main St. in Ottertail.
A formal presentation begins at 5:30 p.m., offering an overview of the study and potential design solutions aimed at improving safety and accessibility along the corridor.
Study Details
MnDOT’s study covers Highway 78 from Highway 10 near Perham, through downtown Ottertail, and along Otter Tail Lake. The focus is on addressing safety concerns and ensuring accessibility for residents, businesses, and visitors.
Participation and Accessibility
MnDOT encourages participation by everyone in the community. If you need an ASL interpreter, documents in braille or large print, or other accommodations, please email Janet Miller at ADArequest.dot@state.mn.us or call 651-366-4720 to make arrangements.
Stay Informed
For more information about the study and updates, visit the Highway 78 project webpage. For real-time travel updates, check www.511mn.org or download the 511 MN app from your smartphone’s app store.
This meeting is an opportunity for residents to shape the future of Highway 78 while addressing safety concerns and maintaining the unique character of the area.